Windpark Altenmedingen Römstedt
Windpark Altenmedingen Römstedt is an operating onshore wind farm in Lower Saxony, Germany, with a capacity of 28 MW. It came online in 2026. It has 5 Enercon E-160 EP5 E3 turbines.
Key facts
| Status | Operating |
|---|---|
| Type | Onshore |
| Capacity | 28 MW |
| Online | 2026 |
| Turbines | 5 Enercon E-160 EP5 E3 turbines (about the Enercon E-160 EP5 E3) |
| Country | Germany |
| Region | Lower Saxony |
Windpark Altenmedingen Römstedt is the 402nd largest operating wind farm in Germany, of the 11,016 operating there that we track (13,882 in all, including those being built or planned). See the largest wind farms in Germany and how Germany makes its electricity.
More wind farms in Lower Saxony
- Windpark Bostelwiebeck II, 18 MW
- Weste, 20 MW
- Lemgrabe, 68 MW
- Aljarn, 34 MW
- Windpark Masendorf, 14 MW
All the largest wind farms in Lower Saxony
Source: Marktstammdatenregister (core energy market data register) (Bundesnetzagentur), Datenlizenz Deutschland – Namensnennung – 2.0; see data sources and methods. Indicative: registers differ, and a project's figures change as it's built. Tell us about a correction.