Homechevron_rightLargest wind farmschevron_rightGermanychevron_right2. Bauabschnitt GP wind farm
Wind farm

2. Bauabschnitt GP wind farm

2. Bauabschnitt GP is an operating onshore wind farm in Saxony-Anhalt, Germany, with a capacity of 15 MW. It came online in 2024.

See 2. Bauabschnitt GP in the Wind appOn the map, with its turbines, output, owners, documents and the farms around it.
Open in the Wind app

Key facts

StatusOperating
TypeOnshore
Capacity15 MW
Online2024
CountryGermany
RegionSaxony-Anhalt

2. Bauabschnitt GP is the 1207th largest operating wind farm in Germany, of the 11,004 operating there that we track (13,870 in all, including those being built or planned). See the largest wind farms in Germany and how Germany makes its electricity.

More wind farms in Saxony-Anhalt

All the largest wind farms in Saxony-Anhalt

Source: Marktstammdatenregister (core energy market data register) (Bundesnetzagentur), Datenlizenz Deutschland – Namensnennung – 2.0; see data sources and methods. Indicative: registers differ, and a project's figures change as it's built. Tell us about a correction.