Homechevron_rightInsightschevron_rightWind Watch
Wind Watch · Explainer · November 2026 · Great Britain

Why is a wind turbine not turning when it's windy?

Usually because the grid can't take its power. In Great Britain that happened on almost every day of 2026: 12 TWh of wind was turned down between January and October, nearly all of it in Scotland. Here are the five reasons a turbine stands still in a good wind.

Revolution Energy·
12.0 TWhGB wind turned down, January to October 2026
97%of it at farms in Scotland
£306mpaid to wind farms to turn down
25 m/sa common wind speed for a turbine to stop itself

1. The grid can't carry the power

This is the most common reason, in Britain at least. The wind blows hardest in Scotland, but most of the electricity is used in England, and the lines between them can carry only so much. When Scottish farms would send more than the lines can take, the system operator, NESO, pays them to turn down and pays a power station nearer the demand, usually burning gas, to turn up. It's called curtailment, or a constraint.

It isn't rare. Between January and October 2026, wind farms in Great Britain were turned down by 12.0 TWh, already more than in the whole of 2025 (just over 10 TWh, by Montel's count). That's as much electricity as about 4.8 million British homes use in a year. The wind farms were paid £306 million to turn down, and the gas that replaced them cost more on top.

Wind turned down in Great Britain each month of 2026, TWh

Jan 2026: 1.27 TWh turned down, £27.4m paid1.3JanFeb 2026: 0.93 TWh turned down, £14.6m paid0.9FebMar 2026: 1.70 TWh turned down, £47.5m paid1.7MarApr 2026: 1.32 TWh turned down, £36.3m paid1.3AprMay 2026: 0.64 TWh turned down, £10.6m paid0.6MayJun 2026: 0.92 TWh turned down, £25.1m paid0.9JunJul 2026: 0.75 TWh turned down, £22.1m paid0.8JulAug 2026: 0.47 TWh turned down, £8.8m paid0.5AugSep 2026: 2.16 TWh turned down, £61.8m paid2.2SepOct 2026: 1.82 TWh turned down, £51.9m paid1.8Oct
Accepted bids to reduce output by wind farms in the balancing mechanism, summed by month. Source: Elexon BMRS. The most was turned down in September and October.

A handful of big Scottish farms account for much of it. Seagreen, off the Angus coast, was turned down by 3.3 TWh, on 265 days of the year so far. The others at the top of the list are offshore in the Moray Firth and the Firth of Forth, and Viking on Shetland.

Wind farmTypeMWGWh turned downDaysPaid
SeagreenOffshore1,0753,260265£26.0m
Moray EastOffshore9502,187268£36.7m
Moray WestOffshore8821,715239£35.8m
VikingOnshore, Shetland4431,138231£12.9m
Neart na GaoitheOffshore450284107£17.1m
DorenellOnshore177261184£6.5m

1 January to 21 November 2026. Payments are Elexon's indicative cashflows for the accepted bids. Capacity from the Renewable Energy Planning Database.

Our day of turn-down, farm by farm shows how it plays out half hour by half hour, and why a single national price makes it happen.

2. The wind is too strong

A turbine reaches its full power in a moderate wind and makes no more as the wind gets stronger. In a storm it protects itself: above its cut-out speed, commonly about 25 metres a second (90 km/h), it turns its blades edge-on to the wind and stops, then starts again once the wind drops back. So on the wildest days of the year, some turbines stand still on purpose.

3. It's being serviced or repaired

Turbines are machines: each one stops now and then for planned servicing, and for faults. On a big farm, one or two standing still while the rest turn is usually this. Larger outages have to be announced; in Britain generators publish them as REMIT notices, which is how Windfolio shows the energy each farm lost to outages, month by month.

4. The price is below zero

On windy, sunny days with low demand, the wholesale price of electricity can fall below zero, so generators pay to keep running. A wind farm that isn't paid a fixed price for its output, or whose support stops when prices are negative, often chooses to stop instead. It happens more and more in Germany, the Netherlands, Spain and Australia.

5. Its permit says stop

Some farms must stop at set times under their planning consent: on summer evenings when bats are flying, when a low sun would cast flickering shadows across nearby homes, or at night to keep noise down. These pauses are short and local, but they explain why one turbine stands still while its neighbours turn.

And sometimes it's calm up there

The wind at the hub of a turbine, often 100 metres or more up, can differ from the wind where you're standing. A turbine needs about 3 metres a second to start turning.

Method and sources

  • Turned down: every accepted bid by a wind farm's balancing unit in the balancing mechanism, 1 January to 21 November 2026, from Elexon BMRS (contains BMRS data © Elexon Limited copyright and database right): 241 wind units, 32.1 GW. Payments are Elexon's indicative cashflows. The tiles and chart cover January to October, whole months.
  • Homes: Ofgem's typical domestic consumption value for electricity, 2,500 kWh a year from July 2026.
  • Cut-out speed: US Department of Energy, "How do wind turbines survive severe storms?"; the exact figure varies by model.

Checked against published figures:

  • 2025: just over 10 TWh of GB wind curtailed, 98% of it in Scotland (Montel). Ours for January to October 2026: 12.0 TWh, 97% in Scotland.
  • The wider cost of constraints, including the gas plants turned up, passed 2025's £1.47 billion by early October 2026 (Octopus Energy's Wasted Wind tracker). Our £306 million is only what wind farms were paid to turn down.

Free to reuse with credit. Please cite:

Revolution Energy, "Why is a wind turbine not turning when it's windy?", Wind Watch, November 2026. revolutionenergy.net/insights/turbine-not-turning