Homechevron_rightLargest wind farmschevron_rightThe United Kingdomchevron_rightWhitelee Windfarm Extension Phase 1
Wind farm
Whitelee Windfarm Extension Phase 1
Whitelee Windfarm Extension Phase 1 is an operating onshore wind farm in Scotland, United Kingdom, with a capacity of 108 MW. It came online in 2012.
See Whitelee Windfarm Extension Phase 1 in the Wind appOn the map, with its turbines, output, owners, documents and the farms around it.
Open in the Wind appKey facts
| Status | Operating |
|---|---|
| Type | Onshore |
| Capacity | 108 MW |
| Online | 2012 |
| Consented | 20 May 2009 |
| Construction began | 1 December 2010 |
| Fully operational | 31 October 2012 |
| Country | United Kingdom |
| Region | Scotland |
Whitelee Windfarm Extension Phase 1 is the 46th largest operating wind farm in the United Kingdom, of the 831 operating there that we track (1,290 in all, including those being built or planned). See the largest wind farms in the United Kingdom and how the United Kingdom makes its electricity.
More wind farms in Scotland
- Whitelee, 322 MW
- Whitelee Windfarm Extension phase 2, 109 MW
- West Browncastle, 30 MW
- Calder Water Community Wind Farm, 28 MW
- Dunwan Dam, Eaglesham - Wind Farm, 30 MW
- Sneddon Law Community Wind Farm, 45 MW
All the largest wind farms in Scotland
Source: Renewable Energy Planning Database (DESNZ), Open Government Licence v3.0; see data sources and methods. Indicative: registers differ, and a project's figures change as it's built. Tell us about a correction.