Wind farm
Date Golden wind farm
Date Golden wind farm is an operating onshore wind farm in Japan, with a capacity of 34 MW. It came online in 2017.
See Date Golden wind farm in the Wind appOn the map, with its turbines, output, owners, documents and the farms around it.
Open in the Wind appKey facts
| Status | Operating |
|---|---|
| Type | Onshore |
| Capacity | 34 MW |
| Online | 2017 |
| Country | Japan |
Date Golden wind farm is the 53rd largest operating wind farm in Japan, of the 240 operating there that we track (340 in all, including those being built or planned). See the largest wind farms in Japan and how Japan makes its electricity.
More wind farms in Japan
- Date wind farm, 10 MW
- Rusutsu wind farm, 60 MW
- Wind farm near Rankoshimachi, 25 MW
- SGET Iwaizumi wind farm, 46 MW
- Wind farm near Suttsu, 15 MW
- Seiryo wind farm, 189 MW
Source: Global Wind Power Tracker (Global Energy Monitor), CC BY 4.0; see data sources and methods. Indicative: registers differ, and a project's figures change as it's built. Tell us about a correction.