Homechevron_rightLargest wind farmschevron_rightGreecechevron_rightLeonidas Kourouna (V-Ridium) wind farm
Wind farm
Leonidas Kourouna (V-Ridium) wind farm
Leonidas Kourouna (V-Ridium) wind farm is a planned onshore wind farm in Thessaly and Central Greece, Greece, with a capacity of 33 MW.
See Leonidas Kourouna (V-Ridium) wind farm in the Wind appOn the map, with its turbines, output, owners, documents and the farms around it.
Open in the Wind appKey facts
| Status | Planned |
|---|---|
| Type | Onshore |
| Capacity | 33 MW |
| Country | Greece |
| Region | Thessaly and Central Greece |
One of 980 wind farms we track in Greece. See the largest there and how Greece makes its electricity.
More wind farms in Thessaly and Central Greece
- Zapades wind farm, 19 MW
- Kenegos wind farm, 25 MW
- Ammoutselos Playia Vasilako wind farm, 37 MW
- Mytikas (Ten Energy Trikalon) wind farm, 19 MW
- Kedros (Green Velocity) wind farm, 22 MW
- Kaltsa wind farm, 14 MW
All the largest wind farms in Thessaly and Central Greece
Source: Global Wind Power Tracker (Global Energy Monitor), CC BY 4.0; see data sources and methods. Indicative: registers differ, and a project's figures change as it's built. Tell us about a correction.