Wind farm
Hiperión wind farm
Hiperión wind farm is an operating onshore wind farm in Castilla y León, Spain, with a capacity of 50 MW. It came online in 2011.
See Hiperión wind farm in the Wind appOn the map, with its turbines, output, owners, documents and the farms around it.
Open in the Wind appKey facts
| Status | Operating |
|---|---|
| Type | Onshore |
| Capacity | 50 MW |
| Online | 2011 |
| Country | Spain |
| Region | Castilla y León |
Hiperión wind farm is the 124th largest operating wind farm in Spain, of the 876 operating there that we track (1,543 in all, including those being built or planned). See the largest wind farms in Spain and how Spain makes its electricity.
More wind farms in Castilla y León
- Juno wind farm, 50 MW
- Magaña wind farm, 25 MW
- La Luna wind farm, 50 MW
- Rea Unificado wind farm, 41 MW
- Castilfrío wind farm, 25 MW
- Sierra Del Cortado wind farm, 32 MW
All the largest wind farms in Castilla y León
Source: Global Wind Power Tracker (Global Energy Monitor), CC BY 4.0; see data sources and methods. Indicative: registers differ, and a project's figures change as it's built. Tell us about a correction.