Wind farm
Chantada wind farm
Chantada wind farm is an operating onshore wind farm in Galicia, Spain, with a capacity of 50 MW. It came online in 2005.
See Chantada wind farm in the Wind appOn the map, with its turbines, output, owners, documents and the farms around it.
Open in the Wind appKey facts
| Status | Operating |
|---|---|
| Type | Onshore |
| Capacity | 50 MW |
| Online | 2005 |
| Country | Spain |
| Region | Galicia |
Chantada wind farm is the 103rd largest operating wind farm in Spain, of the 876 operating there that we track (1,543 in all, including those being built or planned). See the largest wind farms in Spain and how Spain makes its electricity.
More wind farms in Galicia
- Suime wind farm, 26 MW
- Penas Grandes wind farm, 14 MW
- Agratrina wind farm, 56 MW
- Tenzas do Aire wind farm, 12 MW
- Monte Cabezas wind farm, 38 MW
- Maxal wind farm, 41 MW
All the largest wind farms in Galicia
Source: Global Wind Power Tracker (Global Energy Monitor), CC BY 4.0; see data sources and methods. Indicative: registers differ, and a project's figures change as it's built. Tell us about a correction.