Wind farm
Castilla y León hybrid wind farm
Castilla y León hybrid wind farm is a planned onshore wind farm in Castilla y León, Spain, with a capacity of 535 MW. It is expected online in 2026.
See Castilla y León hybrid wind farm in the Wind appOn the map, with its turbines, output, owners, documents and the farms around it.
Open in the Wind appKey facts
| Status | Planned |
|---|---|
| Type | Onshore |
| Capacity | 535 MW |
| Expected online | 2026 |
| Country | Spain |
| Region | Castilla y León |
One of 1,543 wind farms we track in Spain. See the largest there and how Spain makes its electricity.
More wind farms in Castilla y León
- Molinaseca wind farm, 60 MW
- Abano wind farm, 77 MW
- Aquarii wind farm, 70 MW
- Valdesamario wind farm, 24 MW
- Valdecarrión wind farm, 34 MW
- Valdelacasa wind farm, 11 MW
All the largest wind farms in Castilla y León
Source: Global Wind Power Tracker (Global Energy Monitor), CC BY 4.0; see data sources and methods. Indicative: registers differ, and a project's figures change as it's built. Tell us about a correction.