Homechevron_rightLargest wind farmschevron_rightThe United Kingdomchevron_rightCrystal Rig Wind Farm Phase III
Wind farm
Crystal Rig Wind Farm Phase III
Crystal Rig Wind Farm Phase III is an operating onshore wind farm in Scotland, United Kingdom, with a capacity of 14 MW. It came online in 2016.
See Crystal Rig Wind Farm Phase III in the Wind appOn the map, with its turbines, output, owners, documents and the farms around it.
Open in the Wind appKey facts
| Status | Operating |
|---|---|
| Type | Onshore |
| Capacity | 14 MW |
| Online | 2016 |
| Consented | 18 June 2015 |
| Construction began | 15 January 2016 |
| Fully operational | 22 December 2016 |
| Country | United Kingdom |
| Region | Scotland |
Crystal Rig Wind Farm Phase III is the 351st largest operating wind farm in the United Kingdom, of the 831 operating there that we track (1,290 in all, including those being built or planned). See the largest wind farms in the United Kingdom and how the United Kingdom makes its electricity.
More wind farms in Scotland
- Crystal Rig Extension II, 21 MW
- Crystal Rig Wind Farm Phase IV, 48 MW
- Aikengall II, Wester Dod Community Wind Farm, 61 MW
- Aikengall, 48 MW
- Crystal Rig Wind Farm Phase 2a, 138 MW
- Crystal Rig Phase 1 Repowering, 72 MW
All the largest wind farms in Scotland
Source: Renewable Energy Planning Database (DESNZ), Open Government Licence v3.0; see data sources and methods. Indicative: registers differ, and a project's figures change as it's built. Tell us about a correction.