Homechevron_rightLargest wind farmschevron_rightThe United Kingdomchevron_rightCrystal Rig Phase 1 wind farm
Wind farm
Crystal Rig Phase 1 wind farm
Crystal Rig Phase 1 is an operating onshore wind farm in Scotland, United Kingdom, with a capacity of 63 MW. It came online in 2004.
See Crystal Rig Phase 1 in the Wind appOn the map, with its turbines, output, owners, documents and the farms around it.
Open in the Wind appKey facts
| Status | Operating |
|---|---|
| Type | Onshore |
| Capacity | 63 MW |
| Online | 2004 |
| Consented | 22 January 2003 |
| Fully operational | 30 June 2004 |
| Country | United Kingdom |
| Region | Scotland |
Crystal Rig Phase 1 is the 84th largest operating wind farm in the United Kingdom, of the 831 operating there that we track (1,290 in all, including those being built or planned). See the largest wind farms in the United Kingdom and how the United Kingdom makes its electricity.
More wind farms in Scotland
- Crystal Rig Phase 1 Repowering, 72 MW
- Crystal Rig Wind Farm Phase 2a, 138 MW
- Crystal Rig Wind Farm Phase IV, 48 MW
- Aikengall IIa Community Wind Farm, 82 MW
- Aikengall II, Wester Dod Community Wind Farm, 61 MW
- Aikengall, 48 MW
All the largest wind farms in Scotland
Source: Renewable Energy Planning Database (DESNZ), Open Government Licence v3.0; see data sources and methods. Indicative: registers differ, and a project's figures change as it's built. Tell us about a correction.