Homechevron_rightLargest wind farmschevron_rightThe United Kingdomchevron_rightClyde Wind Farm Extension (Clyde 2)
Wind farm
Clyde Wind Farm Extension (Clyde 2)
Clyde Wind Farm Extension (Clyde 2) is an operating onshore wind farm in Scotland, United Kingdom, with a capacity of 173 MW. It came online in 2017.
See Clyde Wind Farm Extension (Clyde 2) in the Wind appOn the map, with its turbines, output, owners, documents and the farms around it.
Open in the Wind appKey facts
| Status | Operating |
|---|---|
| Type | Onshore |
| Capacity | 173 MW |
| Online | 2017 |
| Consented | 23 July 2014 |
| Construction began | 20 July 2015 |
| Fully operational | 15 August 2017 |
| Country | United Kingdom |
| Region | Scotland |
Clyde Wind Farm Extension (Clyde 2) is the 35th largest operating wind farm in the United Kingdom, of the 831 operating there that we track (1,290 in all, including those being built or planned). See the largest wind farms in the United Kingdom and how the United Kingdom makes its electricity.
More wind farms in Scotland
- Grayside Wind Farm, 147 MW
- Whitelaw Brae Wind Farm, 57 MW
- Tweed Valley, Southern Uplands - Oliver Forest Wind Farm, 50 MW
- Priestgill Wind Farm, 46 MW
- Clyde Wind Farm, 350 MW
- Glenkerie Wind Farm, 22 MW
All the largest wind farms in Scotland
Source: Renewable Energy Planning Database (DESNZ), Open Government Licence v3.0; see data sources and methods. Indicative: registers differ, and a project's figures change as it's built. Tell us about a correction.