Inner Mongolia Urad Rear Banner (Mengneng) Guaranteed Off-Take wind-storage farm
Inner Mongolia Urad Rear Banner (Mengneng) Guaranteed Off-Take wind-storage farm is an operating onshore wind farm in Inner Mongolia, China, with a capacity of 1,000 MW. It came online in 2025.
Key facts
| Status | Operating |
|---|---|
| Type | Onshore |
| Capacity | 1,000 MW |
| Online | 2025 |
| Country | China |
| Region | Inner Mongolia |
Inner Mongolia Urad Rear Banner (Mengneng) Guaranteed Off-Take wind-storage farm is the 25th largest operating wind farm in China, of the 4,884 operating there that we track (8,745 in all, including those being built or planned). See the largest wind farms in China and how China makes its electricity.
More wind farms in Inner Mongolia
- Inner Mongolia Wulate Rear Banner (Guohua) Distributed wind farm, 50 MW
- Inner Mongolia Urad Rear Banner Distributed wind farm, 50 MW
- Inner Mongolia Urad Rear Banner (Xiaoyuan) Distributed wind farm, 50 MW
- Inner Mongolia Alashanyou Banner (Jieyuan) wind farm, 100 MW
- Inner Mongolia Northeast Wulanbuhe Desert Megabase wind farm, 3,500 MW
- Inner Mongolia Urad Rear Banner (Longi) Green Hydrogen wind farm, 850 MW
All the largest wind farms in Inner Mongolia
Source: Global Wind Power Tracker (Global Energy Monitor), CC BY 4.0; see data sources and methods. Indicative: registers differ, and a project's figures change as it's built. Tell us about a correction.